Khan v Mohammed [2018] FJHC 425; HBC103.2013 (23 May 2018)
IN THE HIGH COURT OF FIJI
AT SUVA
CIVIL JURISDICTION
Civil Action No. HBC 103 of 2013
BETWEEN : HAFIZUD DEAN KHAN and MOHAMMED TAABISH AKBAR and NISAR AHMED ALI as Trustees of the FIJI MUSLIM LEAGUE, a body duly registered under the Registration of Religious Bodies Act.
PLAINTIFF
AND : FEROZ GULAM MOHAMMED of Nakasi, Nausori, Businessman.
1ST DEFENDANT
AND : SUN (FIJI) NEWS LIMITED trading as FIJI SUN
2ND DEFENDANT
BEFORE: Master Vishwa Datt Sharma
COUNSELS: Mr. Shelvin Singh - for the Plaintiff
Mr. O’Driscoll - for the 1st Defendant
Mr. Naidu - for the 2nd Defendant
DATE OF RULING: 23rd May, 2018
RULING
[Court’s own motion for the Plaintiff to show cause why the Statement of Claim should not be struck out
for want of prosecution and abuse of the process of the Court pursuant to Order 25 Rule 9 of the High Court Rules, 1988]
(A) INTRODUCTION
- The Court issued Notice of its own motion pursuant to Order 25 Rule 9 of the High Court Rules, 1988 for the Plaintiff to show cause as to why the action ought not to be struck out for want of prosecution or an abuse of the process of the Court.
- The Plaintiff filed the Notice of Intention to Proceed. He also filed the Affidavit opposing the striking out for want of prosecution.
- The 1st Defendant did not file any Affidavit but in his submissions supported the strike out of the Plaintiff’s action.
- The 2nd Defendant also did not file any affidavit but informed court that he supported the striking out of the Plaintiffs claim.
- Written skeletal submission was filed by the 2nd Defendant only.
(B) THE LAW AND PRACTICE
- Order 25 Rule 9 of the High Court Rules 1988, which inter-alia states as follows:
“9. – (1) If no step has been taken in any cause or matter for six months then any party on application or the Court of
its own motion may list the cause or matter for the parties to show cause why it should not be struck out for want of prosecution
or as an abuse of the process of the Court.
(2) Upon hearing the application the Court may either dismiss the cause [or] matter on such terms as may be just or deal with the
application as if it were a summons for directions.’
(C) ANALYSIS and DETERMINATION
- The Plaintiff is required to show cause herein and the Court to determine as to why the Plaintiff’s action ought not to be struck out for want of prosecution or an abuse of the process of the Court.
- Both Defendants have supported the striking out of the Plaintiff’s Substantive action.
- It is noted upon the perusal of the Affidavit of the Plaintiff deposed by Saiyad Hussain in his capacity as the Manager and Trustee,
that he has failed to annex any authority from the other Trustees as per the requirement of Order 41 Rule 9 (2) of the High Court Rules 1988 which stipulates;
(2) Every affidavit must be indorsed with a note showing on whose behalf it is filed and the dates of swearing and filing, and an
affidavit which is not so indorsed may not be filed or used without the leave of the Court.
- The Affidavit was also deposed on behalf of the other Trustees and no authority was annexed. Accordingly, no leave was sought from
the court to file and/or use such Affidavit into evidence.
- The principles to be applied on the basis upon which the discretion to strike out proceedings for want of prosecution should be exercised is well established in the decision of the House of Lords in the case of Birkett v James [1978] AC 297 and in particular the statement by Lord Diplock at 318:
“The power should be exercised only where the court is satisfied either (1) that the default has been intentional and contumelious,
e.g. disobedience to a peremptory order of the court or conduct amounting to an abuse of the process of the court; or (2) (a) that
there has been inordinate and inexcusable delay on the part of the plaintiff or his lawyers, and (b) that such delay will give rise
to a substantial risk that it is not possible to have a fair trial of the issues in the action or is such as is likely to cause or
to have caused serious prejudice to the defendants either as between themselves and the plaintiff or between each other or between
them and a third party.”
- In the present case the court is concerned with the application of both principle (1) and (2) (a) and (b) within the Birkett v James [1978] AC 297 case.
- ‘Inordinate’ and ‘inexcusable’ within Birkett v James have their ordinary meaning. Whether delay can be described as inordinate or inexcusable is a matter of fact to be determined in the
circumstances of each individual case. The New India Assurance Company Limited –v- Rajesh K. Singh and Anr. Civil Appeal no: ABU 0031 of 1996S (26 November 1999) C.A.
- Where principle (2) is relied on, both grounds of inordinate and inexcusable delay needs to be established before an action is struck out. There must be both delay of the kind described and a risk of an unfair trial or serious prejudice to the defendants.
- Reference is therefore made to the case Department of Transport v Smaller (Transport) Limited [1989] 1 All ER 897.
The House of Lords did not accept a submission that the decision in Birkett should be reviewed by holding that where there had been inordinate and inexcusable delay, the action should be struck out, even if there can still be a fair trial of the issues and even if the defendant has suffered no prejudice as a result of the delay.
Lord Griffiths, after a review of the authorities and relevant principles, said at 903 that he had not been persuaded that a case
had been made out to abandon the need to show that post-writ delay will either make a fair trial impossible or prejudice the defendant. He went on to affirm the principle that the burden is on the defendant to establish that serious prejudice would be caused to it by the delay. (In this case the burden is on the 2nd Defendant to establish any prejudice).
- I have perused the court file in terms of the documents filed as required by the set down procedures and the High Court Rules 1988 and set out hereunder the Chronology of Events that has taken place in this case accordingly.
CHRONOLOGY OF EVENTS
15th April, 2013 - Writ of Summons filed
14th June, 2013 - Statement of Claim filed
09th July 2013 - 1st Defendant’s Statement of Defence filed.
17th February, 2014 - 2nd Defendant’s Statement of Defence filed.
Delay
- In considering whether delay of the kind required in terms of Birkett v James case has been established, the court is concerned only with delay on the part of the Plaintiff or their lawyer. It is that delay which must be shown to be inordinate and inexcusable.
- It can be clearly ascertained from the chronology of events as set out in paragraph 16 hereinabove, as to what documents and/or pleadings
were filed and what proactive steps were taken by the parties to this proceedings to ensure that the pleadings were expeditiously
completed and the file was ready to be allocated to a Hon. Judge for hearing and determination accordingly.
- In the present case before this Court, the Plaintiff has submitted in his oral submissions that there is no intentional and contumelious default in this case since the Plaintiff has not disobeyed any orders of this Court. The perusal of the Court file does confirm that the Plaintiff has not disobeyed any orders of this Court.
In fact no orders were made as such by the court for the Plaintiff to comply.
- The Plaintiff commenced with the Writ Action against the Defendants on 15th April, 2013 and subsequently filed the Statement of Claim on 14th June, 2014. The 1st Defendant had already filed his Statement of Defence on 09th July, 2013 and the 2nd Defendant filed his Statement of Defence on 17th February, 2014 respectively. The final document filed by the Plaintiff as can be ascertained from the chronology of events was his statement of Claim on 14th June, 2013 and no further proactive steps were taken by the Plaintiff to file and serve a Reply to Defence to both the Statement of Defence. Thus, the substantive matter remained impending for a period of about 1 year and 8 months, the period calculated from the commencement of the Writ to the issuance of the Order 25 Rule 9 Notice by the Court on 26th February, 2015. Needless to say that if the High Court Civil Registry had not picked up on this delay in terms of the issuance of
the Order 25 Rule 9 Notice, then to date no further action would have been taken by the parties rather the matter would have remained
impending.
- The Plaintiff has enumerated the reasons and endeavoured to explain the delay at paragraphs 9-14 of his Affidavit filed on 02nd July, 2015. In summary, he stated that “Lawyer Mr Shelvin Singh handled the Plaintiff’s case whilst employed by Ms. Parshotam Lawyers and later resigned. The Plaintiff’s
proceeded on the basis that all the usual steps required in completing litigation of this nature were being taken by the firm. An
update was provided to the Plaintiffs once the Order 25 Rule 9 Notice was served on Parshotam Lawyers. Since then the Plaintiff has
engaged the services of Mr Shelvin Singh Lawyers who was well versed with the matter and will advance the claim on his behalf.”
- The 1st Defendant orally submitted to court that “the Delay was not explained by the Plaintiff. Therefore, that Delay was inordinate and inexcusable.”
- The 2nd Defendant submitted that ”over 18 months has elapsed since the last action on the matter by the 2nd Defendant and the Plaintiff has not taken any action in the proceedings since the filing of the Writ of Summons and the Statement
of Claim. He added that the passage of time and circumstances of the case has made the Plaintiff’s claim moot and academic”.
- Upon a careful perusal of the court record together with the chronology of events, I find that the Plaintiff after filing his Statement
of Claim failed to take any proactive steps to move the matter further at least by filing and serving the Reply to the Defendant’s
Statement of Defence.
- The Plaintiff’s explanation that Mr Shelvin Singh handled the matter when he was employed by Ms. Parshotam Lawyers and that
after he resigned, the Plaintiff proceeded with the matter on the basis that all the litigation will be completed by the firm of
Ms. Parshotam Lawyers.
- The Plaintiff in fact engaged and instructed the firm of Ms. Parshotam Lawyers and not Mr Shelvin Singh Lawyers to commence the litigation
and represent him in this matter. Mr Shelvin Singh was only assigned with the brief/case to handle the litigation and represent the
Plaintiff. After Mr Shelvin Singh resigned and left the firm, Ms. Parshotam Lawyers had the responsibility to handle and
pursue the matter and ensure its final disposition to the satisfaction of the Plaintiff.
The Plaintiff should have been informed by Ms. Parshotam Lawyers that since Mr. Shelvin Singh has resigned, the Plaintiff’s
case will be continued to be handled by the firm of Ms. Parshotam Lawyers unless the Plaintiff wanted to engage Mr Shelvin Singh
as his Counsel henceforth and accordingly a notice as to the change of Solicitors was filed informing the Defendants of the change
of representation.
Whatever it may be, the Plaintiff should have known better what he was required to do when he was faced with such circumstances, either
to stick with Ms. Parshotam’s and/or go with Mr Shelvin Singh Lawyers to represent him and have the conduct of his matter until
the final disposition.
Nothing concrete was done to ensure that proactive measures and steps were taken to complete the cause and enter the action for hearing
and determination, rather the matter left in abeyance for a long period of time and remained stagnant before this court.
It is also noted that even upon the service of the Order 25 Rule 9 Notice that required the Plaintiff to file and serve a Notice of Intention to Proceed with the matter, was not adhered to and/or filed to at least show the Defendants that the Plaintiff had the intention to proceed
with the matter.
- For every case which takes up time [a good example is the current case], another case is potentially delayed, bearing in mind that a number of cases are impending for hearing and determination by the
court. If the case which takes up time [As in the current case] and delays another case is, on any view, an utter waste of time and
resources and stands in the way of other more deserving being heard at an earlier time, then that is a factor which the courts cannot
ignore.
- However, the overriding objective of the procedural rule and the requirement in ‘Birkett v James is to enable the court “to deal with cases justly”. Dealing with a case justly includes “allotting to it an appropriate share of the court’s resources, while taking
into account the need to allot resources to other cases”.
- Whether Delay is inordinate must be related to the particular circumstances of the case. It is obvious to me that when viewed by reference
to the particular circumstances of this case as discussed hereinabove, that it was incumbent on the Plaintiff [no matter who he was
being represented by] to move forward with the matter with substantially more expedition and caution then was seen in the current
case. The Plaintiff seemed to have gone off to sleep and only awoke when served with the Court’s Order 25 Rule 9 Notice seeking to strike out the matter for want of prosecution.
- I find for the aforesaid rational that the Plaintiff’s explanation for the period of Delay as mentioned hereinabove is unacceptable. Therefore, the period of inactivity is inexcusable. Inexcusable and inordinate Delay has been established against the Plaintiff by the Defendants accordingly.
Prejudice
- Prejudice can be of two kinds. It can be either specific that is arising from particular events that may or may not have occurred
during the relevant period, or general, that is prejudice that is implied from the extent of the delay.
- It should be borne in mind that presumption of prejudice is not a presumption of law. It is a presumption of fact in the sense that, in most cases, it will only be the Defendant who is in a position to offer evidence as to the existence of specific prejudice. The presumption is rebuttable.
- In order to establish prejudice, the Defendant’s are required to show that the Delay has prejudiced them in the conduct of their Defences. This will involve them in having to demonstrate, for example , that they have
lost contact with their witnesses, their witnesses are untraceable, death of their witnesses, the witnesses recollections has been
adversely affected, the destruction of documentary evidence without fault on the part of the Defendants.
- The 1st Defendant submitted that “The Plaintiff’s substantive claim for Defamation must proceed in timely fashion. When the Plaintiff failed to get the
order for injunction then he thought that was the end of the matter. Affidavit doesn’t state the Delay and when Mr Singh left
firm of Ms. Parshotams. It is trite law where the Defendant is faced with serious allegation that needs to be prosecuted expeditiously
and therefore the Defendant is prejudiced. Delay was also ordinate and inexcusable.”
- The 2nd Defendant stated ‘that the passage of time and circumstances of the case has made the Plaintiff’s claim moot and academic. The action was left in abeyance
for such a long time by the Plaintiff in itself is evidence of prejudice to the 2nd Defendant.”
- The Plaintiff has not mentioned anything in terms of Prejudice but stated that “paragraphs 9-14 explains the Delay sufficiently and asked that the matter proceeds to hearing with appropriate directions made.”
- I find that both the 1st and 2nd Defendant have made out a case for prejudice against them in one way or the other.
Interest of Justice and Fair Trial
- The demonstration of inordinate Delay, inexcusable Delay and Serious Prejudice does not lead necessarily to a dismissal of the action.
Further, even if the 1st and 2nd Defendants satisfy the requirements in Birkett v James, the courts in exercise of its jurisdiction must decide as to whether a fair trial is still possible. The Court of Appeal in Chandar Deo v Ramendra Sharma and Anor: Civil Appeal No. ABU 0041 of (23 March 2007) (Unrep) stated as follows:-
[15] A more fundamental difficulty for the Respondent is that the judge failed to make any finding at all on the final question to
be asked when applying the Birkett v. James principles namely: ‘In view of the delays which have occurred, is a fair trial now possible?’ (Also case of Department of Transport v, Chris Smaller (Transport Limited [1989] AC 1197 refers.
- In Lovie v Medical Assurance Society Limited [1992] 2 NZLR 244 at 248. Eichelbaum CJ reviewed the authorities and concluded:
‘The applicant must show that the plaintiff has been guilty of inordinate delay, that such delay is inexcusable, and that it
has seriously prejudiced the defendant. Although these considerations are not necessarily exclusive, and at the end one must always stand back and have regard to the interests of justice, in this country, ever since NZ Industrial Gases Ltd v Andersons Ltd [1970] NZLR 58 it has been accepted that if the application is to be successful, the applicant must commence by proving the three factors listed.’
- Even the courts are reluctant to strike-out any matter summarily which has certain merits in it on the grounds of abuse of process.
In Dey v. Victorian Railway Commissioners (1949) 78 CLR 62, at 91 Dixon J said:-
’26. This principle was restated by the Court of Appeal of Fiji in Pratap v Kristian Mission Fellowship [2006] FJCA 41. Also refer to; New India Assurance Co Ltd v Singh [1999] FJCA 69.
The principle as enunciated in these cases reflects the principles on this topic in other common law jurisdictions. These decisions
include; Metropolitan Bank Ltd v Pooley (1885) 10 App Cas 210; Dey v. Victorian Railway Commissioners (1949) HCA 1; (1949) 78 CLR 62; Birkett v James [1978] AC 297; Lovie v Medical Assurance Society Limited [1992] 2 NZLR 244; Agar v Hyde [2001] HCA 41; (2000) 201 CLR 552. Indeed the passage from Abdul Kadeer Kuddus Hussein v Pacific Forum Line reflects closely Birkett v James (above). These authorities also make the point that in exercising a peremptory power of the kind under contemplation in these proceedings,
the court must be cautious and to put the matter in another way, the court must stand back and ensure that sufficient regard is ahead of the interests of justice.’
- I reiterate that neither the Plaintiff nor the Defendants have addressed this court on anything on the possibility of having a fair trial in terms of having
lost contact with their witnesses, their witnesses are untraceable, death of their witnesses, the witnesses recollections has been
adversely affected, the destruction of documentary evidence without fault on the part of the Defendants and so forth.
- Taking into consideration both parties oral and written submissions, there is no indication as such that in the interest of justice
a fair trial is still very much possible in this matter to allow the matter to proceed to trial with the completion of the cause accordingly.
Further, this matter remains pending in court since its commencement on 15th April, 2013.
- I find in the given circumstances that whilst the Defendants have been dragged into this court with the allegation of Defamation as
the substantive issue for this court to determine and the Plaintiff failing to take any proactive measures to conclude the pleadings
and enter the action for trial, in the interest of justice a fair trial is not possible.
Abuse of Court Process
- Inordinate and inexcusable delay alone, however great, does not amount to an abuse of the Court process. Reference is made to Abbuthnot Latham Bank Ltd v Trafalgar Holdings [1997] EWCA Civ 2999; [1998] 1 WLR 1426 (per Lord Woolf).
- For this purpose, Delay alone, even delay of 11 years does not amount to an abuse of process. Reference made to Barclays Bank Plc v Mailing (Unreported) 23 April 1997; CA (Civil Division) cited in Abbuthnot (supra) at pg 1432, para G-H.
- However, Delay which involves complete, total or wholesale disregard of the Rules of the Court with full awareness of the consequences is capable
of amounting to such an abuse, so that, if it is fair to do so, the action will be struck out or dismissed on that ground. Case Reference
Choraria v Sethia [1998] CLC 625 9 per Nourse LJ) [1998] EWCA Civ 24.
- In the current case, I find from the pleadings and Affidavits filed so far, although the pleadings remains to be completed by the
Plaintiff that the Plaintiff had no intention to pursue this matter forward. If he had any intention whatsoever, then he would have proceeded with the matter expeditiously. In
that, he would have filed the Reply to both Defendant’s Defenses and moved on with the matter to ensure the same is maintained until such time that the matter is heard and eventually brought to
its conclusion. It cannot be ascertained from the evidence on the Court Record that the Plaintiff has commenced this action without
having any intention whatsoever of bringing it to a conclusion.
- It is also appropriate to briefly allude to the issue of Costs. The conduct of the substantive matter in the proceedings has been such that the actions of the Plaintiff failed to maintain the
proceedings until such time the matter is heard and determined by court. I find that there has been failure in the conduct of the
Plaintiff to maintain his proceedings as was required of him. I accordingly order the Plaintiff to pay each of the two Defendants
(1st and 2nd) a sum of $500 each as summarily assessed cost and paid within 14 days’ time frame.
- I have carefully perused the substantive application, the pleadings filed so far, the written and oral submissions coupled with the
applicable laws and the case authorities and my findings are as follows:-
FINAL ORDERS
(i) The delay in terms of inordinate and intentional has been established against the Plaintiff;
(ii) Explanation has not been satisfactorily provided by the Plaintiff for the period of delay as such the Plaintiff has not overcome
the factor of inexcusable;
(iii) The 1st and 2nd Defendants have suffered prejudice; and
(iv) In the interest of justice, a fair trial is still not possible to the current.
(v) There is abuse of the Court process by the Plaintiff;
(vi) The Order 25 Rule 9 Notice hereby succeeds accordingly; and - (vii) The substantive matter is Struck Out for want of prosecution in terms of Order 25 Rule 9.
- (viii) The Plaintiff is ordered to pay a summarily assessed cost of $500 each to the 1st and 2nd Defendants within a period of 14 days’ timeframe.
Dated at Suva this 23rd Day of May, 2018
.................................................................
Master
VISHWA DATT SHARMA
cc: Shelvin Singh Lawyers, Suva.
Messers O’Driscoll & Co, Suva.
Patel Sharma Lawyers, Suva.